Skip to main content

Bi-Weekly Maintenance

info

For A Complete List with other Time Frames See Section:
Complete Maintenance Schedule

Bi-Weekly Operations:​

Time-estimate note

Estimated total man-hours of downtime: 15 minutes per BioDryer

SectionDescriptionTime Estimate (man hours)LOTO?
NAGeneral Spillage Cleaning0.25 hoursNot Required

General Biosolids Spillage Cleaning​

Regular cleaning of biosolids spillage is an important part of preventive maintenance. During loading and unloading cycles, it's common for bits of biosolids to fall out of the machine and accumulate under the BioDryer. Operators should make it a routine to inspect the area around the BioDryer and promptly clean the floor if any biosolids spillage is detected. This practice helps maintain a clean and safe working environment and upholds the operational efficiency of the BioDryer facility.

warning

If biosolids accumulate under the BioDryer and an operator opts not to use a leaf blower for cleaning, it's imperative to follow the Lockout/Tagout (LOTO) procedure. This ensures that all energy sources to the BioDryer are properly isolated and locked out before any cleaning commences beneath the machine. Adhering to the LOTO procedure is crucial for preventing any unintended startup of the BioDryer during cleaning, thereby ensuring the safety of the personnel involved.

Personal Protective Equipment​

Safety GlovesSafety Glasses

Tools and Materials required

Required Tools​

  • Flashlight (if necessary)
  • Leaf Blower or push broom

Consumables​

  • NA

Timeframe​

  • Estimated total of 0.25 man hours to complete.

Procedure​

  1. Safety First
    • Put on the PPE to protect yourself from any potential hazards.
  2. Cleaning and Clearing
    • Use the leafblower or push broom to remove any biosolids that did not make their way into the BioDryer.
    • Dispose of the biosolids that accumulated below.